Find Goulds Pump Components, Pump Spare Parts, Goulds Parts on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Goulds Pump Components > Centrifugal Pump Goulds 3196 Pump Shaft

Centrifugal Pump Goulds 3196 Pump Shaft

Basic Info

Model No.:  Goulds 3196

Product Description

Model NO.: Goulds 3196 Load: Drive Shaft Journal Diameter Dimensional Accuracy: IT6-IT9 Shaft Shape: Real Axis Journal Surface Roughness: 2.5-0.63μm The Material: Stainless Steel ,4140 ,316 Delivery Time: 30 Days Specification: according to customer′s drawings HS Code: 84139100 Material: Carbon Steel Stiffness & Flexibility: Stiffness / Rigid Axle Axis Shape: Straight Shaft Appearance Shape: Round Machining: CNC Machining Certificate: BV and ISO 9001 Trademark: ZLT Origin: Zibo, Shandong Province, China 1.Production Specification
 
Number Item Specification
1 Material Carbon steel, Stainless steel, brass or as per customer's requirements.
2 Diameter 0.3-17mm, tolerance: +/-0.001mm
3 Roundness 0.001mm
4 Roughness Ra0.04
5 Straightness 0.001mm
6 Hardness HRC/HV
7 Precision Grade 6
8 Length Max. 1000mm
9 Heat treatment Point hardening, quenching hardening
10 Surface treatment Zinc plating, nigrescence, chrome plating, nickel plating etc.
11 OEM Service Providing us the drawing with detail information.

2 .  ANSI  Goulds pump shaft 

The model  and material 
 
                     G1105S         316/4140 or other material 
                     G2105S      316/4140  or other material 
                      G3105S      316/4140   or other material 
 

FAQ:
1. How long can I get the price?
Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).
 
2. If you supply the OEM parts ?
 Yes, we  are professional at the OEM parts based on customer's drawings or samples. 
 
3.How long can I expect to get the sample?
  Normally 25 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.
 
4.What about the leading time for mass production?
It depends on the order quantity. Normally, 30~45 days after receiving of deposit. 
 
5.What is your MOQ?
We don't have a strict limit, small quantity is also workable.

 

Contact us if you need more details on Pump Shaft. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Goulds Pump Shaft、Chemical Pump Shaft. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Goulds Pump Components

Premium Related Products