Find Lost Wax Casting, OEM Castings Pump Parts, Stainless Steel Castings on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Investment Castings > OEM Stainless Steel Water Pump Parts

OEM Stainless Steel Water Pump Parts

Basic Info

Model No.:  pump parts

Product Description

Model NO.: Pump Parts Process: Lost Wax Casting Application: Machinery Parts Surface Preparation: Spray-Paint Machining Tolerance: +/-0.10mm Certification: SGS, CE, RoHS, ISO 9001:2000, ISO 9001:2008 Certificate: BV and ISO 9001 Machining: CNC Machining Castings Method: Lost Wax Casting Trademark: ZLT Origin: Lost Wax Casting in Shandong Province, China Casting Method: Directional Crystallization Molding Technics: Pressure Casting Material: Stainless Steel Surface Roughness: Ra0.8 Standard: ANSI R Material: Stainless Steel , Alloy Steel , Carbon Steel Delivery Time: 30 Days Samples , 30days Batch Production Weight: 0.5kg~80 Kg Dimension: According to Customer′s Drawings Specification: according to customer′s drawings HS Code: 84139100 Product Description
Product Name: precision casting stainless steel /metal  castings  

Description: Silicasol lost wax precision casting, smooth surface, accurate dimenstion

Material: Stainless steel 

Type: Precision  casting

Application: Auto&agricultural machinery part and different industry

Weight : 0.5kg~80 Kg 

Detailed Description:

As advanced technology and stable quality make accurate size and smooth surface,

Most surfaces can be used stable without machining, the deformation of wax is small,

Automation and assembly line production, spectrometer detector to analyse chemical

Composition, so that product quality is good and stable.
lost wax Casting Parts   picture :
  
   OEM Stainless Steel Water Pump Parts
  OEM Stainless Steel Water Pump Parts

Why Choose us:

* Zibo Qingdong machinery  had been engaged in Casting and Machining industry for more than 10 years.
 
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.

* We now supply all forms of casting parts and cnc Machining Parts:  lost wax investment casting, Sand casting, and cnc machining services. 
 
* Rich OEM service experience.
 
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
 
* Our Commitment & Responsiblity:
      1.Competitive Price
      2.Strict Quality Control
      3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
      4.Timely Delivery 
       5.Small Quantity Acceptable

FAQ:
1. How long can I get the price?
Prices will be quoted within 24 hours after we get your inquiry with detailed information ( including drawings, material, surface treatment,quantity, special requirements,etc).
 
2.How can I get a sample to check your quality?
Once the quotation confirmed,the sample can be sent to you for your testing . 
 
3.How long can I expect to get the sample?
  Normally 25 days~30 days (including mould making time). Samples will be shipped by DHL, FedEx, UPS, TNT or EMS,ect.
 
4.What about the leading time for mass production?
It depends on the order quantity. Normally, 30~45 days after receiving of deposit. 
 
5.What is your MOQ?
We don't have a strict limit, small quantity is also workable.
 

Contact us if you need more details on Stainless Steel Pump Parts. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Alloy Steel Pump Parts、Carbon Steel Pump Parts. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Investment Castings